All Weather Pitch In Rivervalley.

I am happy to announce following my request for lighting at the all weather pitch in Rivervalley that work is about to start in September.
Update from the Parks Superintendent:
Ducting for 3 number lighting standards will be installed in the coming weeks. There is a small number of things to be agreed internally.  Such as site would the site be suitable to trial LED lights and whether a timer is required.
 
It is expected that the columns will be installed and connected in September in time for the dark winter evenings.
 
Scroll to Top